NAV24 Logo
  • Homepage
EN | PL
Show / Hide Table of Contents

🏭 Production Orders

Production Main View

Production Order Line Comments

Page Customization

  • Released Production Orders

Ability to add a BI Report to the Machine Centers view

Block Manual Insertion of Production Order Lines

Added an option in ⚙️ N24CM - Core Manufacturing Setup to block the manual insertion of lines into open Production Orders. This restricts line creation exclusively to the Refresh Production Order function.

Verify Routing Link Code during BOM Certification

An option in ⚙️ N24CM - Core Manufacturing Setup to verify whether all Items in a Production BOM have an assigned Routing Link Code.

Check BOM, Routing, and Location Code

Validation of Production Order lines to ensure that the BOM No., Routing No., or Location Code are populated. This option can be enabled in ⚙️ N24CM - Core Manufacturing Setup.

In This Article
Any questions? 👉 Contact us: produkty@nav24.pl ↑ Back to top